Project File:

Hobsonville Warf

Client
Auckland Council

Location
Hobsonville, Auckland

Time Period
Completed: August 2012


 

Project Description


Total Marine Services were contracted to design and build a new ferry terminal pontoon and gangway platform as part of the upgrade to the inner wharf.

Performance


The project was completed within budget and on time, the ferry terminal was quickly put to use by Auckland commuters and the feedback from the council has been positive

Physical Works Associated with the Boat Ramp

  • Removal of the existing pontoon and gangway
  • Installation of 8 Polyethelyne sleeved steel piles
  • Assembly and installation of a 172 sqm concrete pontoon system
  • Installation of a steel and Hardwood timber fendering system
  • Installation of a steel platform and the supporting pile
  • Installation of a 24 metre covered gangway