Project File:

Orakei Marina

Client
Client – Orakei Marina
Contact – Anthony Mair
Phone - +64 9 524 8444

Location
Auckland
36° 84' S 174° 81' E

Time Period
Mar 2006 - Nov 2006

 

Project Desription


Orakei Marina is Auckland newest marina and was opened in 2006. There are 180 berths within the marina ranging between 12m and 40m in length and the marina is protected by a solid rock breakwater on three sides. Total Marine Services were awarded the contract to install the floating pontoons, piles and miscellaneous fittings for the marina.
Within six months of the marina being completed Total Floating Systems and Total Marine Services were commissioned to cast new concrete floats to construct the floating structure that was to house the marina office.

Performance


The existing ground condition within the breakwater area was sandstone which determined that all piles had to be drilled. The project was completed on time and within budget. Feedback from the Orakei Marina has been positive and encouraging with the berth holders very happy with our commitment and performance.

Physical Works

  • Install 27 steel, 110 concrete and 225 timber piles
  • Install all floating walkways and fingers
  • Install gangways
  • Design, cast concrete floats and construct floating structure to house marina office

Client Testimonials:


I have had associations with eight marine construction companies over the last 30 years completing more than 17 marina developments together with numerous marine civil engineering projects and I can confidently state that Total Marine Services would be my first choice for future marine works.
Anthony Mair, M.I.N.Z.P.E reg Engineer