Wharves and jetties


Total Marine Services can offer a complete design and build solution for any Wharf and Jetty project. Whether it is a commercial wharf for large ferries or private jetties to moor individual boats, Total Marine Services has the expertise and skills to assist.

Vivian Bay, Kawau Island

Location : Kawau Island | Date: September 2008 - November 2010

The project first started off as a small fixed wooden walkway structure to provide water access to pedestrians of the proposed development. As the discussions evolved the project soon grew to become a structure to allow vehicular and helicopter access and 154m long walkway over rocky outcrops and tidal flow areas.

Read Project Details

Lidgard House, Kawau Island

Location : Kawau Island | Date: September 2010 - September 2010

The existing wooden wharf structure outside Lidgard House had deteriorated over time and was deemed unsafe. TMS were engaged to refurbish/rebuild a new wooden wharf to ensure the safety of any users. TMS undertook the responsibility to construct and design the wharf to ensure that it could be constructed within a realistic timeframe and met the necessary safety provisions.

Read Project Details

Kawau Island Yacht Club

Location : Kawau Island | Date: September 2008 - September 2010

The existing wooden wharf structure outside the yacht club had deteriorated over time and was deemed unsafe. TMS were engaged to refurbish/rebuild a new wooden wharf to ensure the safety of any users. TMS undertook the responsibility to construct and design the wharf to ensure that it could be constructed within a realistic timeframe and met the necessary safety provisions.

Read Project Details

Bentzen Farms

Location : Kawau Island | Date: August 2007 - November 2007

This was a private installation which included two fixed wharfs and floating pontoon structures and a boat ramp. The ground conditions where the boat ramp was to be located was classified as being non structural and the boat ramp had to be constructed as an independent self supporting structure.

Read Project Details

Birkenhead Ferry Terminal

Location : Birkenhead, Auckland | Date: Completed: August 2012

Total Marine Services were contracted to design and build a new ferry terminal pontoon and gangway platform as part of the upgrade to the inner wharf.